Construction of a new pedestrian walkway along Victoria Whart linking Titanic Slipway to Alexandra Dock.
- Reference
- Z/2014/1714/F
- Status
- Granted
- Application type
- Full
- Location
- Victoria Wharf Titanic Quarter Queens Road Queens Island Belfast BT3 9DT
- Council
- Belfast City Council
- Received
- 17-Dec-14
- Added
- 17 Dec 2014
Planning history at this location
1 other application recorded at or next to this site.
- LA04/2017/0727/DC Granted
Discharge of condition planning application Z/2014/1714/F
Recent applications nearby
- LA04/2026/1680/F VALID
Erection of a Magnet Recycling Facility with ancillary office space associated car parking landscaping site works and access arrangements from Harland Road and…
- LA04/2026/1494/F VALID
Retractable awnings to front elevation of units D.1-D.5 and unit E (Lofter House) and units A B and C (Shipwright House). Minor elevational changes including a…
- LA04/2026/1429/F CONSULTATION(S) ISSUED
Three-storey extension to the south-east of existing operations engineering workshop to provide replacement port operations control centre ancillary office acc…
- LA04/2026/1281/DC Decided
Partial Discharge of condition 5 of Planning approval LA04/2026/0393/F - Verification Report
- LA04/2026/1225/F CONSULTATION(S) ISSUED
Construction of a Wastewater Pumping Station (WwPS) with associated motor control centre lay-by serving bay fencing and ancillary site works
- LA04/2026/1021/DC CONDITION PARTIALLY DISCHARGED
Discharge condition 12 of planning approval LA04/2024/0393/F Written specification and sample panel for external brickwork and external cladding.
- LA04/2026/0401/F CONSULTATION(S) ISSUED
4no moving tent covers for final assembly of ship components (Class B3)
- LA04/2026/0935/DC Decided
Discharge Condition 6 of Planning Appoval LA/2016/1691/F Verification Report