Internal and external refurbishment of building to include temporary access ramp and public toilets
- Reference
- Z/2007/1222/LB
- Status
- Granted
- Application type
- Listed Building Consent
- Location
- Thompson Dock Pump House Titanic Quarter Belfast
- Council
- Belfast City Council
- Received
- 17-May-07
- Added
- 17 May 2007
Planning history at this location
3 other applications recorded at or next to this site.
- Z/2012/0892/F Granted
Restoration and repair of existing blocks1&2 including re-roofing external fabric repairs & new windows. Internal alterations including removal of existing wal…
- Z/2012/0158/LBC Granted
Restoration and repair of existing blocks 1 and 2 including re -roofing external fabric repairs and new windows. Internal alterations including removal of exis…
- Z/2007/1239/F Granted
Internal and external refurbishment of building to include temporary access ramp and public toilets
Recent applications nearby
- LA04/2026/1680/F VALID
Erection of a Magnet Recycling Facility with ancillary office space associated car parking landscaping site works and access arrangements from Harland Road and…
- LA04/2026/1429/F CONSULTATION(S) ISSUED
Three-storey extension to the south-east of existing operations engineering workshop to provide replacement port operations control centre ancillary office acc…
- LA04/2026/1021/DC CONDITION PARTIALLY DISCHARGED
Discharge condition 12 of planning approval LA04/2024/0393/F Written specification and sample panel for external brickwork and external cladding.
- LA04/2026/0653/PAN PROPOSAL OF APPLICATION NOTICE IS ACCEPTABLE
Proposed erection of Magnet Recycling Facility with ancillary office space associated car parking landscaping site works and access arrangements from Donegall…
- LA04/2025/1857/F Approved
Installation of a waste compactor smoking shelter and the partial removal of an existing armco barrier
- LA04/2025/1539/DC Decided
Discharge condition 8 of LA04/2024/0393/F-Proposed drainage layout and details.
- LA04/2025/1372/DC Decided
Discharge Condition 7 of LA04/2024/0393/F- Final Construction Environmental Management Plan (CEMP).
- LA04/2025/1373/DC Decided
Discharge of Condition 2 of LA04/2024/0393/F- Contamination Assessment & Remediation Strategy Report.