Proposed car park cabin security fencing and associated site works.
- Reference
- Z/2002/2294/F
- Status
- Granted
- Application type
- Full
- Location
- Townsend Street adjacent to Westlink
- Council
- Belfast City Council
- Received
- 08-Oct-02
- Added
- 8 Oct 2002
Planning history at this location
5 other applications recorded at or next to this site.
- LA04/2023/4433/DC Decided
Noise impact assessment. Condition 9 of LA04/2022/1029/F
- LA04/2023/3587/DC Decided
Discharge of condition 5 LA04/2022/1029/F (Details/samples of external finishes)
- LA04/2023/3420/DC CONDITION PARTIALLY DISCHARGED
Discharge of Conditions 3 and 4 of LA04/2022/1029/F
- LA04/2022/1029/F Granted
Transcendental meditation (TM) centre on ground floor with 4no. residential units above on 1st and 2nd floors external amenity space bin storage and bicycle sh…
- Z/2008/0800/F Granted
Car park with security fencing.
Recent applications nearby
- LA04/2026/1742/DC CONSULTATION(S) ISSUED
Discharge condition no.3 of planning approval LA04/2025/1390/F- Noise Impact Assessment
- LA04/2026/1582/NMC VALID
Alterations to approved shopfront access to be as formerly existing.
- LA04/2026/1534/F CONSULTATION(S) ISSUED
Conversion of the existing three-storey terraced building at nos. 33–39 Gresham Street to provide six short-term holiday-let apartments including the conversio…
- LA04/2026/1561/DCA VALID
Minor internal and external demolition works to facilitate the retention conversion refurbishment and change of use of existing buildings at No. 24 Rosemary St…
- LA04/2026/1648/F CONSULTATION(S) ISSUED
Construction of toilet facilities at first floor level within existing public house (Listed Building)
- LA04/2026/1574/A CONSULTATION(S) ISSUED
Face-illuminated school crest enclosure (1750mm x 2200mm) featuring a graphic panel above built-up metal dimensional lettering (485mm cap height) in a dark fin…
- LA04/2026/1586/DC CONSULTATION(S) ISSUED
Discharge of conditions 8 & 11 of planning application LA04/2025/0477/F
- LA04/2026/1523/LBC CONSULTATION(S) ISSUED
Removal and retention of the existing timber sliding sash window components and installation of a new commemorative stained glass leaded window within the exis…