Councils › Ards and North Down › W/2007/0280/F
Phase 8A Shaftesbury construction of 10 no. apartments site nos 281-290. (Amended Plans)
- Reference
- W/2007/0280/F
- Status
- Granted
- Application type
- Full
- Location
- Phase 8A Site nos 281-290 Shaftesbury Belfast Road Bangor.
- Council
- Ards and North Down Borough Council
- Received
- 23-Mar-07
- Added
- 23 Mar 2007
Planning history at this location
2 other applications recorded at or next to this site.
- LA06/2018/0406/F Granted
Proposed glazed door and side screen to replace existing window.
- W/2007/0338/F Granted
Phase 8B Shaftesbury Construction of 34 no category one elderly apartments for oaklee housing association. (Amended plans/description)
Recent applications nearby
- LA06/2026/0799/O CONSULTATION(S) ISSUED
Dwelling on lands to rear of 40-42a Church Street accessed via Croft Lane
- LA06/2026/0688/F Case Officer Recommendation
Single-storey extension to rear
- LA06/2026/0480/F Approved
New LED floodlight luminaires on existing masts. Consisting of the removal of the existing fittings and fitting 4 new LED luminaire fittings on each of the exi…
- LA06/2026/0453/A SITE INSPECTED
12x Hoarding Signs (Reterospective)
- LA06/2026/0347/F CONSULTATION(S) ISSUED
New online stormwater storage facility comprising underground tank with associated sewer infrastructure including extension to existing culvert new flow contro…
- LA06/2026/0361/DC CONDITION PARTIALLY DISCHARGED
Discharge of condition 2 of Planning Approval LA06/2022/1286/F which states 'no development will take place on-site until the method of sewage disposal has bee…
- LA06/2026/0117/F Approved
Single storey rear extension elevation and layout alterations and associated siteworks
- LA06/2026/0131/F Approved
Raised platform to the rear; rear dormer and front roof lights. Alterations to fenestration (previous approval LA06/2024/1004/F)