Councils › Ards and North Down › W/2003/0585/F
Extension to dwelling house.
- Reference
- W/2003/0585/F
- Status
- Granted
- Application type
- Full
- Location
- 5 Balmoral Park Ballyree Bangor Northern Ireland BT
- Council
- Ards and North Down Borough Council
- Received
- 03-Jul-03
- Added
- 3 Jul 2003
Planning history at this location
4 other applications recorded at or next to this site.
- W/2009/0541/F Granted
Proposed conservatory to rear of dwelling.
- W/1998/0663 Granted
Detached garage to rear of dwelling.
- W/1994/0028 Granted
Garage
- W/1992/0478 Granted
Residential development (9no Dwellings)
Recent applications nearby
- LA06/2026/0832/F NEIGHBOURS NOTIFIED
6 no. dwellings: Change of house type to units 138-143 of approval W/2003/1085'
- LA06/2026/0884/DC CONSULTATION(S) ISSUED
Discharge of Condiition 10 of previously approved application LA06/2022/0873/F which states - Prior to the construction of the drainage network the applicant s…
- LA06/2026/0758/DC CONSULTATION(S) ISSUED
Discharge of Condition 15 of previously approved application LA06/2022/0873/F which states:- No construction works shall commence on site until the final Const…
- LA06/2025/1099/F Approved
Fourteen dwellings - change of house design from two blocks of townhouses (W/2003/1085) to four blocks of three semi-detached and four semi-detached. Existing…
- LA06/2025/1020/F Approved
Variation of existing Townhouse Type F / Type E to provide semi-detached properties within the original build footprint. Existing road infrastructure / car par…
- LA06/2025/0992/F Approved
12no. Dwellings (Change of house type E from approval W/2003/1085/F).
- LA06/2025/1001/F Approved
Artificial surface with net enclosure to provide cricket practice facilities.
- LA06/2025/0993/F Approved
Increased ridge height and two-storey rear extension (retrospective)