Councils › Antrim and Newtownabbey › U/2015/0008/F
Installation of 225kw wind turbine hub height up to 51.5m with blade tip height up to 65m with associated switch room (…
- Reference
- U/2015/0008/F
- Status
- Withdrawn
- Application type
- Full
- Location
- 500m north of 63 Boghill Road Ballyutoag Mallusk
- Council
- Antrim and Newtownabbey Borough Council
- Received
- 26-Jan-15
- Added
- 26 Jan 2015
Full proposal: Installation of 225kw wind turbine hub height up to 51.5m with blade tip height up to 65m with associated switch room (removal of Condition no. 5 of previous approval U/2012/0372/F requiring red warning light on top of hub).
Planning history at this location
3 other applications recorded at or next to this site.
- LA03/2023/0299/S54 Approved
Replacement of existing wind turbine (51.5m hub height and 65m tip height) approved under U/2012/0372/F with a V52 wind turbine up to 51.0m hub height and up t…
- LA03/2021/0136/F Granted
Replacement of existing wind turbine (51.5m hub height and 65m tip height) approved under U/2012/0372/F with a V52 wind turbine up to 51.0m hub height and up t…
- U/2012/0372/F Granted
Installation of a 225kw wind turbine on a tubular tower - height up to 51.5m with blade tip height up to 65m with associated switch room
Recent applications nearby
- LA03/2026/0143/F CONSULTATION(S) ISSUED
150 no. dwellings (Phase 3 of Mill Bridge Hydepark Road Mallusk) bus stop and turning loop (at Hydepark Road) open space and all associated site works
- LA03/2025/0033/DC Decided
Replacement of existing wind turbine (51.5m hub height and 65m tip height) approved under U/2012/0372/F with a V52 wind turbine up to 51.0m hub height and up t…
- LA03/2024/0856/F Approved
Erection of 6no. dwellings (Change of House Type from planning approval LA03/2021/0548/F on plots 20 21 22 and 23)