Councils › Armagh City Banbridge and Craigavon › N/2000/0064/A
Fascia Sign
- Reference
- N/2000/0064/A
- Status
- Granted
- Application type
- Advertisement
- Location
- Unit 1 Phase 2 Rushmere Shopping Centre Craigavon
- Council
- Armagh City Banbridge and Craigavon Borough Council
- Received
- 26-Jan-00
- Added
- 26 Jan 2000
Planning history at this location
5 other applications recorded at or next to this site.
- N/2012/0391/A Granted
Fascia sign poster signs vinyls to glazing and panel sign
- N/2006/0088/F Granted
Erection of plant area with security fencing to the rear of unit 1B
- N/2004/0947/A Granted
1 off fascia
- N/1999/0733/F Granted
Erection of new shopfront
- N/1999/0732/A Granted
Shop signage
Recent applications nearby
- LA08/2026/0998/A VALID
Erection of five shop signs (1 no. principal fascia sign internally illuminated flex face sign . overall size 7000 x 3000mm – 2 no. Secondary Signs Non illumin…
- LA08/2026/0823/F CONSULTATION(S) ISSUED
Change of use from vacated retail store (Use Class A1) to office suite (Use Class B1) comprising reconfiguration of first floor (involving subdivision of unit…
- LA08/2026/0749/A CONSENT GRANTED
Retention of 4 internally illuminated logo shop signs 6 externally illuminated poster board signs 1 internally illuminated freestanding sign and 1 internally i…
- LA08/2026/0486/F Approved
Erection of 11No. HYC200 electrical vehicle charging units parking bollards and bus wheel stops (relocation of same as previously approved via reference LA08/2…
- LA08/2026/0412/F Approved
Reconfiguration and extension of Units 11 and 15 into a single anchor unit with new shop front along west elevation and associated site works.
- LA08/2026/0411/F Approved
Demolition of drive through restaurant and creation of new car parking spaces and consequential reorganisation of car parking layout
- LA08/2026/0162/F Approved
Alterations to shopfront and rear facade. Installation of new trolley bay
- LA08/2025/1409/F Approved
Provision of high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 8no. electric vehicle ch…