Discharge of Conditions: 4 and 5 of LA11/2019/0719/F 4. A Final Construction Environmental Management Plan must be subm…

Brackfield Wood Approx. 150m South West of No. 250 Glenshane Road Londonderry BT47 3SN
Reference
LA11/2022/1144/DC
Status
Decided
Application type
Discharge of Condition
Location
Brackfield Wood Approx. 150m South West of No. 250 Glenshane Road Londonderry BT47 3SN
Council
Derry City and Strabane District Council
Received
08 Dec 2022
Added
8 Dec 2022

Full proposal: Discharge of Conditions: 4 and 5 of LA11/2019/0719/F 4. A Final Construction Environmental Management Plan must be submitted by the appointed contractor to the planning authority prior to work commencing. This shall reflect all the mitigation and avoidance measures detailed in the outline CEMP and the Preliminary Ecological Appraisal. The final CEMP should also confirm: - The timing of piling works to take account of the recommendation of NIEA NED. As timings of piling in relation to salmon run will depend on the location of the site within a catchment and the related salmon peak run timing through that area this should be confirmed with Loughs Agency; - The type of scour protection and the method of installation to demonstrate that it prevents undercutting from river erosion processes; - a drainage plan to confirm the finalised site drainage and confirm if any SuDS is required. The approved CEMP shall be adhered to and implemented throughout the construction period in accordance with the approved details unless otherwise agreed in writing with by the planning authority. Reason: To ensure that the appointed contractor undertaking the work is fully appraised of all the risks associated with the proposal and to provide effective mitigation ensuring there are no adverse impacts on the integrity of River Faughan and Tributaries SAC. 5. A detailed Construction Method Statement (CMS) must be submitted to NIEA Water Management Unit at least eight weeks prior to the commencement of construction.The CMS should include all necessary pollution prevention measures to protect the water environment during the development of this proposal. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment. Faughan Valley Red Brae Trails and Timber Footbridge CEMP October 2022 (CMS contained within)

Recent applications nearby

  • LA11/2026/0694/F CONSULTATION(S) ISSUED
    Proposed Dwelling
    108 M. North of 83 Ardground Road Killaloo Co L'Derry · 1 Oct 2026
  • LA11/2026/0153/F CONSULTATION(S) ISSUED
    Proposed Dwelling and Garage
    Approx. 87 M. North East of 30 Kildoag Road Ardmore L'Derry · 26 Feb 2026