Councils › Ards and North Down › LA06/2026/0609/DC

A final Construction Environmental Management Plan (CEMP) to discharge condition 10 of previous approval LA06/2021/0061…

Lands to West of Nos. 110 & 110A-110D Movilla Road; North of Nos. 6-10 (evens) Cloverhill Park Nos 1 3 & 10 Cloverhill Crescent Nos 5 7 & 8 Deanswood Crescent Nos 12-26 (evens) Edenvale Crescent Nos 58 & 87 Stratheden Heights Nos 7 8 10 & 12 Kensington Park & Nos 2 2A & 4 Earlswood Drive; East of Nos 15-27 (odds) Cronstown Cottage Avenue; South of No 8 Cronstown Lane & North of Phase Two of Rivenwood Newtownards
Reference
LA06/2026/0609/DC
Status
CONSULTATION(S) ISSUED
Application type
Discharge of Condition
Location
Lands to West of Nos. 110 & 110A-110D Movilla Road; North of Nos. 6-10 (evens) Cloverhill Park Nos 1 3 & 10 Cloverhill Crescent Nos 5 7 & 8 Deanswood Crescent Nos 12-26 (evens) Edenvale Crescent Nos 58 & 87 Stratheden Heights Nos 7 8 10 & 12 Kensington Park & Nos 2 2A & 4 Earlswood Drive; East of Nos 15-27 (odds) Cronstown Cottage Avenue; South of No 8 Cronstown Lane & North of Phase Two of Rivenwood Newtownards
Council
Ards and North Down Borough Council
Received
02 Jul 2026
Added
28 Jul 2026

Full proposal: A final Construction Environmental Management Plan (CEMP) to discharge condition 10 of previous approval LA06/2021/0061/F: A final Construction Environmental Management Plan (CEMP) shall be submitted to and agreed by the Council prior to any development activity including ground preparation or vegetation clearance. The final CEMP must identify the perceived risks to the aquatic environment potential pollution pathways and mitigation measures to negate such risks. The final CEMP must as a minimum include the mitigation measures included within the outline CEMP as well as: a) Construction Method Statement(s) - including details of construction and excavation and timing of works; b) Pollution Prevention Plan – including details of a suitable buffer of 10m between the location all construction works refuelling storage of excavated spoil/oil/fuel/substrate/construction materials/machinery concrete mixing and washing areas and any watercourses or any surface drains present on or adjacent to the site. c) Site Drainage Plan; including details of Sustainable Drainage Systems (SuDS) foul waste disposal surface water disposal/treatment and silt management measures; d) Spoil Management Plan; including location of spoil storage areas outwith the 10m buffer zone management and handling of spoil and details of the reinstatement of excavated spoil; e) Environmental Emergency Plan; including details of emergency spill procedures and regular inspections of machinery onsite; f) Water Quality Monitoring Plan; g) Details of mitigation measures to protect badgers; h) Details of the appointment of an Ecological Clerk of Works and their roles and responsibilities. The final approved CEMP shall be fully implemented and adhered to during the construction phase to the reasonable satisfaction of the Council. Reason: To ensure effective avoidance and mitigation measures have been planned for the protection of the water environment and designated sites.

Planning history at this location

6 other applications recorded at or next to this site.

  • LA06/2026/0562/DC CONSULTATION(S) ISSUED
    Discharge of Condition 17 of previously approved LA06/2021/0061/F Prior to the commencement of any development the following information must be submitted to a…
    Lands to West of Nos. 110 & 110A-110D Movilla Road; North of Nos. 6-10 (evens) Cloverhill Park Nos 1 3 & 10 C… · 29 Jul 2026
  • LA06/2026/0585/DC VALID
    Discharge of Condition 22 of Planning Approval LA06/2021/0061/F which states - Prior to the commencement of development a plan showing details and the location…
    Lands to West of 110 & 110A-110D Movilla Road; North of 6-10 (evens) Cloverhill Park 1 3 & 10 Cloverhill Cres… · 2 Jul 2026
  • LA06/2026/0185/DC VALID
    Discharge of Conditions 2 6 and 7 Of Planning Application LA06/2021/0061/F
    Lands to West of Nos. 110 & 110A-110D Movilla Road; North of Nos. 6-10 (evens) Cloverhill Park Nos 1 3 & 10 C… · 24 Mar 2026
  • LA06/2025/0055/DC Decided
    Discharge Condition No. 11. of LA06/2021/0061/F - No site works of any nature or development shall take place until a programme of archaeological work has been…
    West of 110 & 110A-D Movilla Rd North of 6-10 (evens) Cloverhill Pk 1 3 &10 Cloverhill Cres 5 7 & 8 Deanswood… · 28 Jan 2025
  • LA06/2023/2392/DC Decided
    Discharge of Condition 10. of LA06/2021 0061/F No site works of any nature or development shall take place until a programme of archaeological work has been pr…
    west of no 110 & 110A-D Movilla Rd NT of nos 6-10 (evens) Cloverhill Pk nos 1 3 &10 Cloverhill Cres nos 5 7 &… · 9 Nov 2023
  • LA06/2020/0834/PAN Acceptable
    Part of Phase 3 of the concept masterplan approved under Ref: LA06/2017/0533/F for the proposed erection of 190No. dwellings and next phase of the distributor…
    Lands to the West of Nos. 110 and 110A-110D Movilla Road; North of Nos. 6-10 (evens) CLoverhill ParkNos 13 an… · 18 Sept 2020

Recent applications nearby

  • LA06/2026/0827/F SITE INSPECTED
    Single-storey extension and level access to rear.
    238 Donaghadee Road Newtownards BT23 7QP · 14 Sept 2026
  • LA06/2026/0745/O CONSULTATION(S) ISSUED
    Infill dwelling between 183 and 183A Donaghadee Road Newtownards
    Land between 183 and 183A Donaghadee Road Newtownards · 3 Sept 2026
  • LA06/2026/0650/DC VALID
    Discharge of condition 2 of approvalLA06/2025/0566/F: All hard and soft landscape works shall be carried out in accordance with details shown on Drawing No.06C…
    Phase 3 Rivenwood Boulevard Newtownards · 7 Aug 2026
  • LA06/2026/0649/DC VALID
    Discharge condition 4 of LA06/2025/0566/F: No dwelling shall be occupied until the final details of the equipment to be provided in the play park shown on Draw…
    Phase 3 Rivenwood Boulevard Newtownards · 6 Aug 2026
  • LA06/2026/0647/DC CONSULTATION(S) ISSUED
    Discharge of Condition 7 of previously approved application LA06/2025/0566/F which states:- A final Construction Environmental Management Plan (CEMP) shall be…
    Phase 3 Rivenwood Boulevard Newtownards · 6 Aug 2026
  • LA06/2026/0648/DC VALID
    Discharge of condition 5 of LA06/2025/0566/F: A final landscape and play park management and maintenance plan for the development including long term design ob…
    Phase 3 Rivenwood Boulevard Newtownards · 30 Jul 2026
  • LA06/2026/0599/F NEIGHBOURS NOTIFIED
    Two storey rear extension
    1 Fourth Street Rivenwood Newtownards BT23 8AJ · 7 Jul 2026
  • LA06/2025/1142/F CONSULTATION(S) ISSUED
    Residential development comprising 90 no. dwellings play area open space and all associated site works. Site accessed via the northern portion of the future ea…
    Lands located immediately to the South of 181 and 183 Donaghadee Road and immediately to the East and SE of 1… · 4 Feb 2026