A minor adjustment to the construction sequencing within Phase 1 dividing it into two sub-phases (Phase 1a and Phase 1b…
- Reference
- LA04/2025/0345/NMC
- Status
- Approved
- Application type
- Non-Material Change
- Location
- Spirit AeroSystems Airport Road West Belfast BT3 9ED
- Council
- Belfast City Council
- Received
- 04 Mar 2025
- Added
- 4 Mar 2025
- Last updated
- 15 Apr 2025
Full proposal: A minor adjustment to the construction sequencing within Phase 1 dividing it into two sub-phases (Phase 1a and Phase 1b) with a temporary pause in construction between them.
Planning history at this location
1 other application recorded at or next to this site.
- LA04/2026/1227/NMC VALID
Non-Material Change to approval LA04/2019/2850/F- minor adjustments including slightly increased office area changes to office elevations change to roof profil…
Recent applications nearby
- LA04/2026/1498/PAN PROPOSAL OF APPLICATION NOTICE IS ACCEPTABLE
This PAN relates to a proposed full planning application affecting land within the administrative areas of both Belfast City Council and Ards and North Down Bo…
- LA04/2026/1499/PAN PROPOSAL OF APPLICATION NOTICE IS ACCEPTABLE
This PAN relates to a proposed outline planning application affecting land within the administrative areas of both Belfast City Council and Ards and North Down…
- LA06/2026/0775/PAN PROPOSAL OF APPLICATION NOTICE IS ACCEPTABLE
Belfast City Airport is proposing a programme of improvements to enhance passenger facilities improve aircraft operations and strengthen connectivity to and fr…
- LA06/2026/0778/PAN VALID
Belfast City Airport is proposing a programme of improvements to enhance passenger facilities improve aircraft operations and strengthen connectivity to and fr…
- LA04/2025/1890/F CONSULTATION(S) ISSUED
Part retrospective permission for retention of warehouse for storage and distribution including ancillary office use erection of unmanned petrol station above…
- LA04/2026/0137/F SITE INSPECTED
Retention of hardstanding area for the storage of vehicles. Amendments to existing access; Erection of boundary treatments lighting and access control gates.
- LA04/2025/1779/F CONSULTATION(S) ISSUED
Erection of temporary two storey modular office accommodation for a period of 3 years.
- LA04/2025/1780/PAN PROPOSAL OF APPLICATION NOTICE IS ACCEPTABLE
Erection of a new associated office building (approx. 10 125 m² GIA) with associated infrastructure and ancillary facilities including substations security and…