NMC to LA04/2017/1388/F amendments to make provision for canopies at the rail platforms
- Reference
- LA04/2024/1360/NMC
- Status
- Approved
- Application type
- Non-Material Change
- Location
- Lands between Durham Street and Grosvenor Rd to the south and west of the BT Exchange and lands to the east of Durham Street and south of Glengall Street Belfast BT2.
- Council
- Belfast City Council
- Received
- 30 Jul 2024
- Added
- 30 Jul 2024
- Last updated
- 13 Aug 2024
Planning history at this location
30 most recent other applications recorded at or next to this site.
- SPD/2026/0017/DC CONSULTATION(S) ISSUED
Partial Discharge of Condition 19 (Contaminated Land Verification Report) of Planning permission SPD/2023/0991/F for the Belfast Transport Hub in respect of re…
- SPD/2026/0007/DC Decided
Partial Discharge of Condition 6 (Detailed design of road works) within Phases 4-5 of Planning permission LA04/2017/1388/F for the Belfast Transport Hub in res…
- SPD/2025/0029/DC Decided
Partial Discharge of Condition 27 (Piling Risk Assessment with revised scope of works) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast T…
- SPD/2025/0030/DC Decided
Partial Discharge of Condition 20 (Contaminated Land Remediation Strategy and Remediation Implementation and Verification Plan with revised scope of works) for…
- SPD/2025/0031/DC Decided
Partial Discharge of Condition 21 (Groundwater and surface water monitoring plan with revised scope of works) for Phases 4-6 of Planning permission LA04/2017/1…
- SPD/2025/0027/DC Decided
Partial Discharge of Condition 23 (Construction Environmental Management Plan with revised scope of works) for Phases 4-6 of Planning permission LA04/2017/1388…
- SPD/2025/0028/DC Decided
Partial Discharge of Condition 7 (Construction Phase Sustainable Travel Plan with revised scope of works) for Phases 4-6 of Planning permission LA04/2017/1388/…
- SPD/2025/0022/DC Decided
Partial Discharge of Condition 17 (Construction Noise and Vibration Management Plan with revised scope of works) for Phases 4-6 of Planning permission LA04/201…
- SPD/2025/0021/DC Decided
Partial Discharge of Condition 15 (Dust Management Plan with revised scope of works) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast Tra…
- SPD/2024/0085/DC Decided
Discharge of Condition 32 (Planting Plan for Blythefield Park) of Planning Permission LA04/2017/1388/F for the Belfast Transport Hub
- SPD/2024/0083/DC Decided
Partial Discharge of Condition 17 (Construction Noise and Vibration Management Plan) for Specified Works within Phases 1-6 of Planning Permission LA04/2017/138…
- SPD/2024/0084/DC Decided
Partial Discharge of Conditions 22 & 25 (Contaminated Land Verification Report) for Phases 1-3 of Planning Permission LA04/2017/1388/F for the Belfast Transpor…
- SPD/2024/0078/DC Decided
Discharge of Condition 11 (Travel Plan) for Planning permission LA04/2017/1388/F for the Belfast Transport Hub.
- SPD/2024/0081/DC APPLICATION WITHDRAWN
Partial Discharge of Condition 27 (Foundations Works Risk Assessment ) for Sheet Piling Works in the vicinity of Abingdon Drive and Utility Walk within Main Co…
- SPD/2024/0077/DC Decided
Discharge of Condition 17 (Construction Noise and Vibration Management Plan) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast Transport H…
- SPD/2024/0069/DC Decided
Partial Discharge of Condition 23 (Construction Environmental Management Plan) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast Transport…
- SPD/2024/0070/DC Decided
Partial Discharge of Condition 21 (Groundwater and surface water monitoring plan) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast Transp…
- SPD/2024/0071/DC Decided
Partial Discharge of Condition 20 (Contaminated Land Remediation Strategy and Remediation Implementation and Verification Plan) for Phases 4-6 of Planning perm…
- SPD/2024/0067/DC Decided
Partial Discharge of Condition 6 (Detailed design of road works for Phase 1 Public realm works) within Phases 4-5 of Planning permission LA04/2017/1388/F for t…
- SPD/2024/0066/DC Decided
Discharge of Condition 8 (Network Modelling and Analysis for development to the public highway on Durham Street) of Planning permission LA04/2017/1388/F for th…
- SPD/2024/0065/DC Decided
Discharge of Condition 31 (Landscape Layout and Planting Schedule) of Planning permission LA04/2017/1388/F for the Belfast Transport Hub
- SPD/2024/0064/DC Decided
Discharge of Condition 29 (Programme of Works for Archaeological Monitoring - Saltwater / Boyne Bridge) of Planning permission LA04/2017/1388/F for the Belfast…
- SPD/2024/0063/DC Decided
Discharge of Condition 7 (Construction Phase Sustainable Travel Plan) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast Transport Hub.
- SPD/2024/0061/DC Decided
Proposal: Partial Discharge of Condition 27 (Piling Risk Assessment) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast Transport Hub.
- SPD/2024/0062/DC Decided
Partial Discharge of Condition 15 (Dust Management Plan) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast Transport Hub.
- LA04/2024/1890/NMC Approved
Proposed changes to the Site Layout Plan to Planning Approval LA04/2017/1388/F
- LA04/2024/0070/NMC Approved
Non Material Change to approved – LA04/2017/1388/Fchanges to Grosvenor Road entrance to including the steps and the introduction of a new planter to the easter…
- SPD/2023/0993/DC CONSULTATION(S) ISSUED
The Partial Discharge of Planning Condition 24( Contaminated Land Remediation Strategy ) in respect of the discovery of a new contamination on lands at the for…
- SPD/2023/0991/F CONSULTATION(S) ISSUED
Application under Section 54 to remove Condition 5 (restricting the number of daily Belfast to Dublin train services) on planning permission Ref: LA04/2017/138…
- SPD/2023/0978/DC CONSULTATION(S) ISSUED
Discharge of Planning Condition 17 (Construction Noise Management Plan) for the Main Construction Contract Phase 1-3 on Planning Permission Ref: LA04/2017/1388…
Recent applications nearby
- LA04/2026/1718/DC VALID
Discharge of Condition No. 6 of Planning Approval LA04/2020/1666/F Piling Method Statement and accompanying reports and plans.
- LA04/2026/1613/DCA CONSULTATION(S) ISSUED
Rooftop bar
- LA04/2026/1612/F CONSULTATION(S) ISSUED
Rooftop bar
- LA04/2026/1675/F CONSULTATION(S) ISSUED
Temporary Ferris Wheel
- LA04/2026/1648/F CONSULTATION(S) ISSUED
Construction of toilet facilities at first floor level within existing public house (Listed Building)
- LA04/2026/1611/F SITE INSPECTED
Retrospective amendments to prior approved LA04/2023/2529/F in relation to privacy screen
- LA04/2026/1574/A CONSULTATION(S) ISSUED
Face-illuminated school crest enclosure (1750mm x 2200mm) featuring a graphic panel above built-up metal dimensional lettering (485mm cap height) in a dark fin…
- LA04/2026/1416/F CONSULTATION(S) ISSUED
Proposed development of three storey building comprising of 3 No. new build apartments and the redevelopment of an existing vacant property for 3 No. apartment…