Lagan Gateway Phase 2 – Proposed greenway connection extending between Lagan Gateway Phase 1 at Annadale Embankment to…
- Reference
- LA04/2024/1036/F
- Status
- Case Officer Recommendation
- Application type
- Full
- Location
- Lands to the east of the River Lagan located between Lagan Gateway Phase 1 and Belvoir Park Forest running adjacent to the west of Belvoir Park Golf Club and approximately 120 metres to the east of Newtownbreda Water Treatment Plant Galwally Ave Belfast BT8 7YA.
- Council
- Belfast City Council
- Received
- 10 May 2024
- Added
- 10 May 2024
- Last updated
- 13 Jun 2025
Full proposal: Lagan Gateway Phase 2 – Proposed greenway connection extending between Lagan Gateway Phase 1 at Annadale Embankment to Belvoir Forest Park. Comprising compacted gravel paths; a new elevated (4-5 meter high) timber boardwalk (approximately 85m long); landscaping works new cycle stands bollards seats and bins; and all associated works
Recent applications nearby
- LA04/2026/1635/F NEIGHBOURS NOTIFIED
Addition of two storey extension to side and rear.
- LA04/2026/1636/F NEIGHBOURS NOTIFIED
Replacement rear/side extension and side window.
- LA04/2026/1214/F NEIGHBOURS NOTIFIED
Proposed two storey extension to side and rear of existing dwelling with internal alterations and roof space conversion with new flat roof dormer and re-config…
- LA04/2026/1216/NMC Approved
Non Material Chnage to LA04/2024/0342/F: Addition of matching ground floor high level obscure window to match that already previously approved to elevation to…
- LA04/2026/1034/F Approved
Proposed single storey side extension with internal alterations and conversion of existing garage with associated siteworks.
- LA04/2026/0899/F Approved
2-storey front extension single-storey rear extension part demolition of external walls to accommodate new window openings and fenestration changes demolition…
- LA04/2026/0783/F Approved
Single storey rear extension
- LA04/2026/0804/F CONSULTATION(S) ISSUED
Construction of a two-storey rear extension demolition of the existing garage and associated site works.