Mixed tenure residential led development comprising up to 800 units (private rented social and affordable / incl. studi…
- Reference
- LA04/2021/0909/PAN
- Status
- Not Available
- Application type
- Proposal of Application Notice
- Location
- Lands adjacent to and south east of the River Lagan north of Abercorn Crescent/Queen's Road Queen's Island Belfast BT3 9EQ
- Council
- Belfast City Council
- Received
- 19-Apr-21
- Added
- 19 Apr 2021
Full proposal: Mixed tenure residential led development comprising up to 800 units (private rented social and affordable / incl. studios 1 2 and 3 bed units) across 3 blocks; provision of active ground and first floor uses; public realm including public square and promenade; cycle and car parking provision; and associated access and site works.
Planning history at this location
25 other applications recorded at or next to this site.
- LA04/2026/0669/DC Decided
Discharge of conditions 13 & 36 - LA04/2021/2280/F
- LA04/2026/0437/DC Decided
Discharge of Condition 28 - LA04/2021/2280/F - Heating Provision
- LA04/2026/0304/MDPA Decided
Discharge Clause 8.1.1 of the Section 76 of LA04/2021/2280/F- Public Transport Fund.
- LA04/2026/0056/MDPA Decided
Clause 2.5 and 14.3 of the Section 76 Agreement associated with planning permission LA04/2021/2280/F requires a Certificate of Completion in respect of Block 9…
- LA04/2025/1492/MDPA Decided
Clause 4.1 of the Section 76 Agreement associated with planning permission LA04/2021/2280/F- Built to Rent Management Plan.
- LA04/2025/1498/DC Decided
Discharge conditions 12 and 35 of LA04/2021/2280/F- Verification report (Block 9).
- LA04/2025/1468/DC Decided
Discharge condition 42 of LA04/2021/2280/F-Overarching Signage Strategy.
- LA04/2025/1450/F Approved
Installation of roof mounted photovoltaic panels to Block 9 of approved Loft Lines development
- LA04/2025/1321/DC Decided
Discharge of Condiiton no.22 LA04/2021/2280/F - Accoustic Report
- LA04/2025/1257/DC Decided
Discharge condition 2 of LA04/2021/2280/F- Phasing Plans and Autotracking Plan. (Previously approved under LA04/2022/1706/DC).
- LA04/2025/1238/DC Decided
Discharge conditon 26 of LA04/2024/2107/NMC - Acoustic Report for gym / yoga studio.
- LA04/2025/1236/MDPA Decided
Clause 1.1 (Schedule 1 Part B) of the Section 76 Agreement associated with planning permission LA04/2021/2280/F- public realm management plan.
- LA04/2025/0713/DC Decided
Discharge of Condition 6 LA04/2021/2280/F - Car Park Management Plan for Blocks 11 and 11A
- LA04/2025/0712/MDPA Decided
LA04/2021/2280/F Clause 7.1 of the Section 76 Agreement associated with planning permission LA04/2021/2280/F requires details of the Residential Travel Plan fo…
- LA04/2025/0669/DC Decided
Discharge of Condition no.5 LA04/2021/2280/F Car Parking Management Plan for Block 9
- LA04/2025/0674/MDPA Decided
Clause 8.2 of the Section 76 Agreement associated with planning permission LA04/2021/2280/F- Public Transport Fund
- LA04/2025/0676/MDPA Decided
Clause 9.1 of the Section 76 Agreement associated with planning permission LA04/2021/2280/F requires a Car Club Strategy to be submitted to the Council prior t…
- LA04/2022/1705/DC Decided
Discharge of condition Clause 13.1 LA04/2021/2280/F.
- LA04/2022/1706/DC Decided
Discharge of condition 02 LA04/2021/2280/F.
- LA04/2022/1532/DC Approved
Discharge of condition 37 LA04/2021/2280/F.
- LA04/2022/1533/DC Approved
Discharge of condition 39 LA04/2021/2280/F.
- LA04/2022/1534/DC Approved
Discharge of condition 45 LA04/2021/2280/F.
- LA04/2022/1531/DC Decided
Discharge of condition 31 LA04/2021/2280/F.
- LA04/2022/1530/DC Decided
Discharge of condition 29 LA04/2021/2280/F.
- LA04/2021/2280/F Granted
Mixed use mixed tenure residential-led development of 778 apartments in three buildings with internal and external amenity space; flexible commercial/community…
Recent applications nearby
- LA04/2026/1727/A CONSULTATION(S) ISSUED
1 Digital screen
- LA04/2026/1494/F VALID
Retractable awnings to front elevation of units D.1-D.5 and unit E (Lofter House) and units A B and C (Shipwright House). Minor elevational changes including a…
- LA04/2026/1477/F CONSULTATION(S) ISSUED
Construction of roof canopy to facilitate an infill extension to provide ancillary office floorspace and atrium (1 810sqm) internal reconfiguration reduction i…
- LA04/2026/1429/F CONSULTATION(S) ISSUED
Three-storey extension to the south-east of existing operations engineering workshop to provide replacement port operations control centre ancillary office acc…
- LA04/2026/0990/F Approved
The Sub-division of existing retail unit to create two retail units and associated alterations to internal layout and elevations.
- LA04/2026/1247/F CONSULTATION(S) ISSUED
Erection of postal distribution centre (Use Class B4: Storage or distribution) with associated staff fleet and visitor parking; EV-charging points; servicing a…
- LA04/2026/1281/DC Decided
Partial Discharge of condition 5 of Planning approval LA04/2026/0393/F - Verification Report
- LA04/2026/1225/F CONSULTATION(S) ISSUED
Construction of a Wastewater Pumping Station (WwPS) with associated motor control centre lay-by serving bay fencing and ancillary site works