Revision of previous approved application (Z/2012/0645/RM) and erection of 12 no. detached dwellings 4 no. semi-detache…
- Reference
- LA04/2017/0157/F
- Status
- Granted
- Application type
- Full
- Location
- Plots 53-64 and 69-89 and 91-103 9total 46 units0 of residential development to lands south of 25 Harberton Park Belfast.
- Council
- Belfast City Council
- Received
- 05-Jan-16
- Added
- 5 Jan 2016
Full proposal: Revision of previous approved application (Z/2012/0645/RM) and erection of 12 no. detached dwellings 4 no. semi-detached dwellings 3 no. townhouses and 18 no. apartments (in total 37 units) and associated works.
Planning history at this location
1 other application recorded at or next to this site.
- LA04/2019/2380/F Granted
Variation of Condition 8 of previous approval LA04/2017/0157/F to amend landscaping proposals
Recent applications nearby
- LA04/2026/1702/F CONSULTATION(S) ISSUED
Reconfiguration of ground floor to change use of 525m² of approved ground floor commercial floorspace to healthcare use (Use Class D1) associated internal alte…
- LA04/2026/1596/F CONSULTATION(S) ISSUED
Single storey rear extention single storey garage with consultation room and enclosed outdoor space and 2 dormer windows with associated demolition.
- LA04/2026/1597/DCA CONSULTATION(S) ISSUED
Demolition of conservatory and single storey rear extension partial demolition of rear wall windows and doors roof of side extension and sections of the roof t…
- LA04/2026/1678/A CONSULTATION(S) ISSUED
1 Shop sign
- LA04/2026/1598/DC VALID
Discharge condition no.6 of planning approval LA04/2020/0845/O Waste Management Plan
- LA04/2026/1599/DC CONSULTATION(S) ISSUED
Discharge of condition no.2 of planning approval LA04/2024/2026/RM- sample of finishes
- LA04/2026/1525/DC VALID
Discharge Condition no's 24 and 28 of LA04/2020/0845/O. Construction and Environmental Management Plan Plot 8 Kings Hall v2 July 2026
- LA04/2026/1522/F CONSULTATION(S) ISSUED
Widening and reforming the existing driveway to provide two additional parking spaces. Existing access pillars to be replaced and access widened