Discharge of conditions 5 12 14 17 and 18 of planning permission Z/2009/0530/F
- Reference
- LA04/2016/1171/DC
- Status
- Refused
- Application type
- Discharge of Condition
- Location
- Lands East of Victoria Channel and 120m West of the former Harland & Wolff drawing offices Queens Road Queens Island Belfast
- Council
- Belfast City Council
- Received
- 08-Jun-16
- Added
- 8 Jun 2016
Planning history at this location
2 other applications recorded at or next to this site.
- LA04/2023/2688/F Approved
Application to vary Condition 36 of approval LA04/2022/0293/F which grants planning permission for a hotel to extend the maximum length of stay of occupants fr…
- Z/2014/0414/F Granted
Application under article 28 of the Planning (Northern Ireland) Order 1991 to vary planning condition 21 attached to planning permission Z/2009/0530/F to ensur…
Recent applications nearby
- LA04/2026/1727/A CONSULTATION(S) ISSUED
1 Digital screen
- LA04/2026/1494/F VALID
Retractable awnings to front elevation of units D.1-D.5 and unit E (Lofter House) and units A B and C (Shipwright House). Minor elevational changes including a…
- LA04/2026/1477/F CONSULTATION(S) ISSUED
Construction of roof canopy to facilitate an infill extension to provide ancillary office floorspace and atrium (1 810sqm) internal reconfiguration reduction i…
- LA04/2026/1429/F CONSULTATION(S) ISSUED
Three-storey extension to the south-east of existing operations engineering workshop to provide replacement port operations control centre ancillary office acc…
- LA04/2026/0990/F Approved
The Sub-division of existing retail unit to create two retail units and associated alterations to internal layout and elevations.
- LA04/2026/1247/F CONSULTATION(S) ISSUED
Erection of postal distribution centre (Use Class B4: Storage or distribution) with associated staff fleet and visitor parking; EV-charging points; servicing a…
- LA04/2026/1281/DC Decided
Partial Discharge of condition 5 of Planning approval LA04/2026/0393/F - Verification Report
- LA04/2026/1225/F CONSULTATION(S) ISSUED
Construction of a Wastewater Pumping Station (WwPS) with associated motor control centre lay-by serving bay fencing and ancillary site works