Councils › Antrim and Newtownabbey › LA03/2022/0899/F
Proposed erection of a 1mw battery energy storage system facility (BESS) including BESS control room on existing wind t…
- Reference
- LA03/2022/0899/F
- Status
- Approved
- Application type
- Full
- Location
- Lands approx. 218m east of 20 Greenhill Road Belfast
- Council
- Antrim and Newtownabbey Borough Council
- Received
- 14 Oct 2022
- Added
- 14 Oct 2022
Full proposal: Proposed erection of a 1mw battery energy storage system facility (BESS) including BESS control room on existing wind turbine to store and stabilise energy supply for wind turbine
Recent applications nearby
- LA03/2026/0184/DC CONSULTATION(S) ISSUED
Erection of replacement wind turbine with a 40m hub height and 27m blade length to replace existing wind turbine. associated 2no. electricity cabinets and site…
- LA03/2026/0045/F Approved
Proposed machinery store / agricultural shed at Loughview Farm along with associated ancillary works.
- LA03/2025/0822/DC CONDITION PARTIALLY DISCHARGED
Erection of replacement wind turbine with a 40m hub height and 27m blade length to replace existing wind turbine. associated 2no. electricity cabinets and site…
- LA03/2025/0082/DC Decided
Erection of replacement wind turbine with a 40m hub height and 27m blade length to replace existing wind turbine. associated 2no. electricity cabinets and site…