Councils › Mid and East Antrim › LA02/2025/0477/F
Provision of a public greenway for pedestrians and cyclists comprising two bridge crossings over the River Maine and ac…
- Reference
- LA02/2025/0477/F
- Status
- CONSULTATION(S) ISSUED
- Application type
- Full
- Location
- Originating to the east of Galgorm Resort and Spa approximately 130m south east of No. 144 Fenaghy Road and traveling southward between the Fenaghy road and the eastern bank of the River Maine. Crossing to the west bank immediately north of the Galgorm Group site. Finally crossing back to the Fenaghy Road side approx. 105m north-east of No.1 Corbally Road. Continuing beneath the Corbally Road overpass concludes when joining the existing path immediately adjacent the River Maine approx. 55m north-east of No.1 Corbally Road.
- Council
- Mid and East Antrim Borough Council
- Received
- 10 Jun 2025
- Added
- 10 Jun 2025
Full proposal: Provision of a public greenway for pedestrians and cyclists comprising two bridge crossings over the River Maine and access thereto various surface finishes for the greenway fencing drainage and landscaping.
Recent applications nearby
- LA02/2026/0659/F NEIGHBOURS NOTIFIED
Proposed internal alterations and single storey flat roof extension to side and rear of existing property.
- LA02/2026/0651/F CONSULTATION(S) ISSUED
Proposed replacement dwelling and garage with new access and retention of existing for storage
- LA02/2026/0366/F CONSULTATION(S) ISSUED
Proposed double garage to service No's 116-118 Fenaghy Road on ground floor and tourist apartment for short term letting on first floor on site directly opposi…
- LA02/2026/0432/O CONSULTATION(S) ISSUED
PROPOSED 4NO. DETACHED DWELLINGS AND GARAGES
- LA02/2025/0617/O APPLICATION WITHDRAWN
Proposed site for 1 no. infill/cluster dwelling
- LA02/2025/0592/F Approved
Proposed rear two storey extension to holiday let self catering accommodation and alteration to front elevation dormers
- LA02/2025/0451/F Approved
Amended access to planning approval LA02/2024/0359/F
- LA02/2025/0019/F CONSULTATION(S) ISSUED
PROPOSED RUN OF RIVER HYDRO PROJECT CONSISTING OF NEW TURBINE AND TURBINE HOUSE REPLACEMENT OF SLUICE GATES AND ASSOCIATED SCREENINGS