Councils › Mid and East Antrim › LA02/2025/0454/F
Variation of condition 3 and 5 of F/2014/0137/F. Condition No.: 3- No construction works shall be carried out on the up…
- Reference
- LA02/2025/0454/F
- Status
- APPLICATION WITHDRAWN
- Application type
- Full
- Location
- Site located 350m east of the Gobbins Road Islandmagee
- Council
- Mid and East Antrim Borough Council
- Received
- 28 May 2025
- Added
- 28 May 2025
- Last updated
- 3 Sept 2025
Full proposal: Variation of condition 3 and 5 of F/2014/0137/F. Condition No.: 3- No construction works shall be carried out on the upper or lower coastal path during the bird breeding season (between 1st March and 31st August) unless otherwise agreed with the Department Proposed wording to include Proposed Cliff stabilisation measures during the Bird breeding season Condition No.: 5 - No cliff netting or wire mesh shall be used within the designated Gobbins ASSI unless otherwise agreed with the Department. Any cliff netting or wire mesh that is agreed upon shall be temporary and removed between 1st March and 31st August Proposed wording to include Installation of permanent Cliff face retention mesh.
Recent applications nearby
- LA02/2025/0453/F Approved
Installation of Cliff Face Stabilisation works to include Cliff face retention mesh system
- LA02/2024/0934/PAN PROPOSAL OF APPLICATION NOTICE IS ACCEPTABLE
Phase 2 of Gobbins Cliff Path tourist attraction including development of a new cliff-top ‘Welcome Hub’ and cliff-side ‘Ingress Structure’ walkway and bridge;…