Councils › Mid and East Antrim › LA02/2017/0422/F

Retrospective retention of carport railings decking and new vehicular access with removal of conditions 2 and 3 of the…

86 Bay Road Larne
Reference
LA02/2017/0422/F
Status
Granted
Application type
Full
Location
86 Bay Road Larne
Council
Mid and East Antrim Borough Council
Received
09-May-17
Added
9 May 2017

Full proposal: Retrospective retention of carport railings decking and new vehicular access with removal of conditions 2 and 3 of the planning approval LA02/2016/0123/F. Condition 2 requires the rendering of the car port and walls and condition 3 requires the provision of an opaque glazed barrier to first floor veranda.

Planning history at this location

5 other applications recorded at or next to this site.

  • LA02/2024/0843/F CONSULTATION(S) ISSUED
    Renewal of permission LA02/2019/0721/F for a proposed 2.5 storey development of 6 no. 2 bed apartments
    88 Bay Road Larne · 14 Nov 2024
  • LA02/2019/0721/F Granted
    Proposed two and a half storey development of 6 no. 2 bed apartments.
    88 Bay Road Larne · 23 Sept 2019
  • LA02/2017/0481/F Granted
    Proposed two and a half storey development of 8 no apartments (6 no. 2 bed and 2 no. 1 bed units)
    88 Bay Road Larne BT40 1DG · 30 May 2017
  • LA02/2016/0123/F Granted
    Retention of carport railings decking and new vehicular access
    86 Bay Road Larne · 16 Feb 2016
  • F/2005/0435/F Granted
    Apartment Block (3 storey 9 units) (amended plans)
    88 Bay Road Larne. · 8 Dec 2005

Recent applications nearby

  • LA02/2026/0412/F Approved
    Replacement of existing first floor window with patio door.
    30 CHAINE MEMORIAL ROAD CURRAN AND DRUMALISS LARNE BT40 1AD · 4 Jun 2026
  • LA02/2026/0034/F CONSULTATION(S) ISSUED
    Change of use of large dwelling (former guest house) to 4 number apartments
    149 Curran Road Larne BT40 1DD · 20 Jan 2026
  • LA02/2025/0969/F Approved
    Single storey extension to rear of existing dwelling
    29 Bay Park Larne BT40 1BZ · 2 Jan 2026
  • LA02/2025/0107/F Approved
    Installation of a TEMPORARY (3 month) demonstration of equipment that will convert Methanol into Electricity. Proposal includes a hydrogen fuel cell (150kW ele…
    Site within Larne Harbour approx. 190m north of the Ferry Terminal · 7 Feb 2025