Councils › Causeway Coast and Glens › LA01/2025/0861/F
Erection of new front porch and rear extension along with conversion of garage. Proposed new roof with increased ridge…
- Reference
- LA01/2025/0861/F
- Status
- Approved
- Application type
- Full
- Location
- 15 Movilla Road Portstewart
- Council
- Causeway Coast and Glens Borough Council
- Received
- 22 Aug 2025
- Added
- 22 Aug 2025
- Last updated
- 23 Dec 2025
Full proposal: Erection of new front porch and rear extension along with conversion of garage. Proposed new roof with increased ridge height to create further living space and Internal alterations to existing dwelling
Planning history at this location
3 other applications recorded at or next to this site.
- LA01/2025/0463/F Case Officer Recommendation
Proposed retrospective application for retention of metal shed.
- C/2008/0680/F Granted
Single storey bedroom/family room at rear & first floor bedroom extension
- C/2008/0464/F Granted
Proposed new single storey sun-lounge to the rear.
Recent applications nearby
- LA01/2026/1073/NMC VALID
Proposed Non-Material Change to LA01/2024/0746/F (proposed replacement of 2no. semi-detached dwellings to apartment development [comprising 8no. units] roof mo…
- LA01/2026/1042/F CONSULTATION(S) ISSUED
Proposed installation of telephone kiosk on public footpath
- LA01/2026/1043/A CONSULTATION(S) ISSUED
Erection of 1x IIlluminated Digital Display
- LA01/2026/0998/F VALID
Proposed Loft Conversion With Erection Of Front And Rear Dormer Single Storey Rear Extension And New Detached Garage (Renewal Of Approval LA01/2021/1005/F)
- LA01/2026/0969/F NEIGHBOURS NOTIFIED
Proposed Single Storey Rear Extension
- LA01/2026/0794/F SITE INSPECTED
Addition of a first floor to existing bungalow to create 3 new bedrooms bathroom and ensuite. Addition of an ensuite to the existing dwelling at ground floor a…
- LA01/2026/0789/A SITE INSPECTED
The erection of temporary hoarding with vinyl advertising graphics promoting branding and amenities of hotel development.
- LA01/2026/0788/F SITE INSPECTED
The erection of temporary hoarding and access gate CCTV mast with associated engineering works.