Councils › Causeway Coast and Glens › LA01/2024/1110/S54

Section 54 Application to Remove Condition No.7 (Submission of noise survey) & Vary Condition No.3 (assessment of noise…

140m SW of 67 Altikeeragh Road Castlerock
Reference
LA01/2024/1110/S54
Status
Approved
Application type
Section 54 Application
Location
140m SW of 67 Altikeeragh Road Castlerock
Council
Causeway Coast and Glens Borough Council
Received
04 Oct 2024
Added
4 Oct 2024
Last updated
29 Jan 2025

Full proposal: Section 54 Application to Remove Condition No.7 (Submission of noise survey) & Vary Condition No.3 (assessment of noise immissions) from LA01/2019/1119/F. From: Within 4 weeks of a written request by Causeway Coast and Glens Borough Council following a noise complaint from the occupant of a dwelling which lawfully exists or has planning permission at the date of this consent the wind turbine operator shall at his/her expense employ a suitably qualified and competent person to assess the level of noise immissions from the wind turbine at the complainant’s property following the procedures described in Pages 102-109 of ETSU-R-97. Details of the noise monitoring survey shall be submitted to Causeway Coast and Glens Borough Council for written approval prior to any monitoring commencing Causeway Coast and Glens Borough Council shall be notified not less than 2 weeks in advance of the date of commencement of the noise monitoring. Reason: To Protect the Amenity of Existing/Committed Receptors. To: Within 4 weeks of a written request by Causeway Coast and Glens Borough Council following a reasonable noise complaint from the occupant of a dwelling which lawfully exists or has planning permission at the date of this consent the wind turbine operator shall at his/her expense employ a suitably qualified and competent person to assess the level of noise immissions from the wind turbine at the complainant’s property following the procedures described in Pages 102-109 of ETSU-R-97. Details of the noise monitoring survey shall be submitted to Causeway Coast and Glens Borough Council for written approval prior to any monitoring commencing Causeway Coast and Glens Borough Council shall be notified not less than 2 weeks in advance of the date of commencement of the noise monitoring. Reason: To Protect the Amenity of Existing/Committed Receptors.

Planning history at this location

5 other applications recorded at or next to this site.

  • LA01/2026/0350/DC CONSULTATION(S) ISSUED
    Partial discharge of condition 8 of planning approval LA01/2019/1119/F
    140m SW of 67 Altikeeragh Road Castlerock Coleraine Co Londonderry · 2 Apr 2026
  • LA01/2024/0536/DC CONDITION PARTIALLY DISCHARGED
    Partial discharge of condition no. 8 of LA01/2019/1119/F
    140m SW of 67 Altikeeragh Road Castlerock Coleraine · 9 May 2024
  • LA01/2019/1119/F Granted
    Erection of replacement wind turbine with a 40m hub height & 27 m blade length to replace existing wind turbine approved and built under C/2012/0091/F (wind tu…
    140m SW of 67 Altikeeragh Road Castlerock · 14 Oct 2019
  • C/2012/0091/F Granted
    Change of turbine from that previously approved under planning ref C/2010/0686/F (hub height 32m) to a Vergnet wind turbine with 32.3m hub height and 16m blade…
    140m SW of 67 Altikeeragh Road Castlerock · 2 Mar 2012
  • C/2010/0686/F Granted
    250 KW (max) Wind Turbine on 30 Metre Tower.
    140 SW of 67 Altikeeragh Road Castlerock Coleraine BT51 4ST. · 9 Dec 2010