Proposed erection of a 1MW (1.107MWh) Battery Energy Storage System Facility (BESS) including BESS control room at exis…
- Reference
- LA01/2023/1223/F
- Status
- Approved
- Application type
- Full
- Location
- Lands approximately 640m North-West of 59 Moyarget Road Ballycastle
- Council
- Causeway Coast and Glens Borough Council
- Received
- 29 Nov 2023
- Added
- 29 Nov 2023
Full proposal: Proposed erection of a 1MW (1.107MWh) Battery Energy Storage System Facility (BESS) including BESS control room at existing wind turbine site to store and stabilise energy supply from wind turbine
Planning history at this location
2 other applications recorded at or next to this site.
- LA01/2020/0585/F Granted
The removal of existing wind turbine (37m hub height 27m rotor diameter 50.5m blade tip height) and ancillary development deployed at land 682m North West of 5…
- E/2013/0135/F Granted
A single wind turbine up to 250kw with a maximum hub height of up to 37m and a maximum blade diameter of up to 27m comprising proposed new access track of 4.0m…
Recent applications nearby
- LA01/2026/0501/F Approved
Retrospective Farm Diversification Scheme for a Camp Site & Alpaca Walking Tours and Temporary Open Farm Days and associated facilities and amenities Toilet Bl…
- LA01/2026/0392/F Approved
Retrospective Change of Use from Dwelling to Short Term Letting as a farm diversification scheme.
- LA01/2026/0043/PAN PROPOSAL OF APPLICATION NOTICE IS ACCEPTABLE
Proposed Retrospective Farm Diversification Scheme for a Campsite with Associated Facilities; Toilet Block Reception Hut Car Park Craft Barn and Temporary Open…
- LA01/2025/1310/F Approved
Proposed regularisation of material recovery and transfer facility (MRTF) yard area weighbridge fencing security gates landscaping parking access and ancillary…