Councils › Causeway Coast and Glens › LA01/2020/0830/F

Two stretches 33kv overhead electricity line on wooden pole structure consisting of 3 conductors and the route lengths…

New overhead electricity line starting 190m West of 147 Aghanloo Road Limavady BT49 0HY and ending 330m SW of 227 Seacoast Road Limavady Underground electricity cable starting 330m SW of 227 Seacoast Road Limavady and finishing 260m SW of 34 Curragh Road Limavady BT49 0JE New overhead line starting 260m SW of 34 Curragh Road Limavady BT49 0JE and finishing 75m SE of 405 Seacoast Road Limavady BT49 0LW New underground electricity cable starting 75m SE of 405 Seacoast Road Limavady BT49 0LW and finishing approximately 30m SW of the perimeter wall of Magilligan Prison Complex Point Road Limavady BT49 0LR.
Reference
LA01/2020/0830/F
Status
Granted
Application type
Full
Location
New overhead electricity line starting 190m West of 147 Aghanloo Road Limavady BT49 0HY and ending 330m SW of 227 Seacoast Road Limavady Underground electricity cable starting 330m SW of 227 Seacoast Road Limavady and finishing 260m SW of 34 Curragh Road Limavady BT49 0JE New overhead line starting 260m SW of 34 Curragh Road Limavady BT49 0JE and finishing 75m SE of 405 Seacoast Road Limavady BT49 0LW New underground electricity cable starting 75m SE of 405 Seacoast Road Limavady BT49 0LW and finishing approximately 30m SW of the perimeter wall of Magilligan Prison Complex Point Road Limavady BT49 0LR.
Council
Causeway Coast and Glens Borough Council
Received
07-Aug-20
Added
7 Aug 2020

Full proposal: Two stretches 33kv overhead electricity line on wooden pole structure consisting of 3 conductors and the route lengths of each part measures 300m and 1080m in length. Also as part of the project two stretches of 33kv underground cable measuring 4450metres and 4800metres in length laid as per attached drawings nos 712 - 1 - 7 sheets 1 + 2 along the Aghanloo road onto the Seacoast road onto Duncrun road onto Limestone road onto Curragh road back onto the Seacoast road and Point road and finishing at a new electricity sub station behind Magiligan Prison. The purpose of project is to provide a new supply for a proposed new electricity sub station to be build at the rear of the Magiligan prison complex. This will increase the electricity capacity to customer in the local vicinity.

Recent applications nearby

  • LA01/2026/0952/O CONSULTATION(S) ISSUED
    Proposed dwelling & garage within an existing cluster (CTY2A of PPS21)
    Lands approx. 95m North North West of 458 Seacoast Road Limavady · 15 Sept 2026
  • LA01/2026/0841/F CONSULTATION(S) ISSUED
    Replacement single storey dwelling and garage with re use off existing access onto public road
    428 Seacoast Road Limavady · 13 Aug 2026
  • LA01/2026/0679/F SITE INSPECTED
    Construction of small ground floor extension to provide family sitting area
    65 Drumavally Limavady · 26 Jun 2026
  • LA01/2025/1267/F Approved
    Proposed enhancement of safeguarding and security through replacement of hedge with front boundary fence widening of existing lay-by to allow for buses to safe…
    Magilligan Field Centre 375 Seacoast Road Limavady BT49 0LF · 28 Nov 2025
  • LA01/2025/0909/F SITE INSPECTED
    Demolition of existing dwelling and garage and construction of new single storey dwelling with detached double garage
    428 Seacoast Road Limavady · 3 Sept 2025
  • LA01/2025/0593/F Case Officer Recommendation
    Demolition off existing farm buildings and construction off 17no dwellings consisting off 14no semi detached and 3no detached with foul pump station landscaped…
    Lands to the North and East of 355 Seacoast Road Bellerena Limavady · 12 Jun 2025
  • LA01/2025/0418/F Approved
    Retention of existing access - Amendment to planning permission LA01/2018/0293/F.
    468 Seacoast Road Limavady · 24 Apr 2025
  • LA01/2025/0390/O Approved
    Proposed dwelling & garage within an existing cluster (CTY2A of PPS21)
    Approx 40m NE of 462d Seacoast Road Limavady · 18 Apr 2025