The Repower of the existing Rigged Hill Windfarm comprising the following main components; (i) Decommissioning of the e…
- Reference
- LA01/2019/0890/F
- Status
- Granted
- Application type
- Full
- Location
- Existing Rigged Hill Windfarm site 6km East/South East of Limavady
- Council
- Causeway Coast and Glens Borough Council
- Received
- 02-Aug-19
- Added
- 2 Aug 2019
Full proposal: The Repower of the existing Rigged Hill Windfarm comprising the following main components; (i) Decommissioning of the existing 10 turbines (ii) Removal and restoration of the existing substation building and compound (iii) Removal and restoration of other redundant infrastructure (iv) 7 No. wind turbines with an output of around 29MW (v) Construction of approximately 4.82km of new access tracks; (vi) Upgrade of approximately 1.75km of existing access tracks; (vii) Construction of temporary and permanent hardstanding areas for each turbine to accommodate turbine component laydown areas crane hardstanding areas and external transformers and/or switchgears; (viii) Temporary construction compound/laydown areas; (ix) Turning heads and passing places incorporated within the site access infrastructure; (x) New Road Junction with Terrydoo Road; (xi) Meteorological Mast; (xii) Substation with roof mounted solar panels and associated compound (xiii) Removal of self-seeded trees in East of the Site and (xiv) all associated ancillary works.
Planning history at this location
4 other applications recorded at or next to this site.
- LA01/2024/1148/DC CONDITION PARTIALLY DISCHARGED
Discharge of condition 33 of LA01/2019/0890/F
- LA01/2024/1023/DC CONDITION PARTIALLY DISCHARGED
Discharge of Condition 29 of LA01/2019/0890/F
- LA01/2024/0973/DC Decided
Discharge of Condition 23 of LA01/2019/0890/F
- LA01/2024/0972/DC CONDITION PARTIALLY DISCHARGED
Partial Discharge of Condition 26 (parts A B C D E F & G) of LA01/2019/0890/F