Wind farm consisting of 4 wind turbines each with a maximum overall base to blade tip height of 125 metres. Ancillary d…
- Reference
- J/2007/0667/F
- Status
- Granted
- Application type
- Full
- Location
- Golandun Dolan Killeter Castlederg
- Council
- Department for Infrastructure (DfI) - Strategic Planning Division
- Received
- 02-Oct-07
- Added
- 2 Oct 2007
Full proposal: Wind farm consisting of 4 wind turbines each with a maximum overall base to blade tip height of 125 metres. Ancillary developments include turbine transformers located internally or externally; turbine hardstands widening and strengthening of an existing site entrance; an electrical control building with communications antennae; construction of new and amended access tracks and junctions; underground electrical cables and communications lines connecting wind turbines to the control building; on site drainage works; temporary site compound; installation of an 80 high permanent met mast and all ancillary and associated works.
Planning history at this location
1 other application recorded at or next to this site.
- LA11/2021/1091/DC Granted
Discharge of condition 15 (Model of turbine and its Noise specification Colour & Finish) of J/2007/0667/F (Gronan Wind Farm)