Councils › Causeway Coast and Glens › D/2010/0356/F
Windfarm comprising of up to nine turbines (each with an overall maximum height of 101.2m above ground level) and assoc…
- Reference
- D/2010/0356/F
- Status
- Granted
- Application type
- Full
- Location
- Proposed Altaveedan Wind Farm in the townlands of Shelton South Aldorough Altaveedan North Altaveedan South and Turnavedog near Loughguile Co Antrim
- Council
- Causeway Coast and Glens Borough Council
- Received
- 30-Nov-10
- Added
- 30 Nov 2010
Full proposal: Windfarm comprising of up to nine turbines (each with an overall maximum height of 101.2m above ground level) and associated infrastructure including an upgraded site entrance new and upgraded onsite access tracks an onsite substation and control building underground cables two temporary monitoring masts a permanent meteorological mast a communications mast a temporary construction compound a temporary storage area a temporary enabling works compound and road widening and improvement works on sections of the transport route (road improvement works).
Planning history at this location
5 other applications recorded at or next to this site.
- LA01/2022/1019/DC CONSULTATION(S) ISSUED
Discharge of Condition No's 5 7 9 and 12 of D/2010/0356/F
- LA01/2020/0300/F Granted
A Section 54 (Planning Act NI 2011) application to extend the lifetime of the Altaveedan Wind Farm at lands at Shelton South Aldorough Altaveedan North Altavee…
- LA01/2018/0687/DC Granted
Discharge of condition 12 of approval D/2010/0356/F
- LA01/2017/1447/DC Granted
Discharge of Condition 22 of D/2010/0356/F
- LA01/2016/0997/DC Granted
Partial Discharge of Condition 22 and Discharge of condition 27 from Planning Approval D/2010/0356/F
Recent applications nearby
- LA01/2026/0267/DC CONSULTATION(S) ISSUED
Discharge of Condition 12 of D/2010/0356/F