Councils › Causeway Coast and Glens › C/2011/0504/F
Variation of condition 2 (waste types) of planning permission C/2005/0208/F to allow additional non-hazardous waste typ…
- Reference
- C/2011/0504/F
- Status
- Granted
- Application type
- Full
- Location
- Waste Transfer and Materials Recovery Facility (MRF) Craigmore Landfill Site Craigmore Road Ringsend BT51 5HF
- Council
- Causeway Coast and Glens Borough Council
- Received
- 04-Oct-11
- Added
- 4 Oct 2011
Full proposal: Variation of condition 2 (waste types) of planning permission C/2005/0208/F to allow additional non-hazardous waste types to be accepted at the Materials Recovery Facility (MRF) namely EWC code 19 12 12 Other wastes (including mixtures of materials) from mechanical treatment of waste other than those mentioned in 19 12 11 and also EWC code 20 03 01 Mixed municipal waste.
Planning history at this location
4 other applications recorded at or next to this site.
- LA01/2018/1387/F Granted
Retrospective extension to materials recovery facility to accommodate wash plant and addition of cladding and roller shutter doors.
- C/2012/0286/F Granted
Variation of Condition No. 3 (operating hours) of planning permission C/2005/0208/F to allow for 24 hour operation of the Waste Transfer and Materials Recovery…
- C/2005/0208/F Granted
Waste Transfer and Materials Recovery Facility.
- C/1993/0012 Refused
Re-opening of access to refuse dump
Recent applications nearby
- LA01/2026/0652/PAN PROPOSAL OF APPLICATION NOTICE IS ACCEPTABLE
Proposed extension to the approved Cam Burn Wind Farm (C/2011/0459/F and LA01/2022/1209/F) comprising 3no. turbines (tip height up to 150m) crane pads battery…
- LA01/2026/0590/F Approved
Extension of existing Materials Recycling Facility for Biodrying Building/Tunnels and all associated infrastructure including underground pipework to existing…
- LA01/2025/0032/DC Decided
Discharge of Conditions 13 & 14 of LA01/2023/0419/F
- LA01/2024/1291/DC CONDITION PARTIALLY DISCHARGED
Discharge of Condition No. 11 of LA01/2023/0419/F - A final Construction Environmental Management Plan (CEMP) has been submitted to be approved in writing by t…