To construct a hydroelectric renewable energy system on the Gelvin river consisting of an intake weir leat buried pipel…

On south side of the Gelvin River from 330m upstream of Upper Gelvin Bridge to 880m downstream to cross under Legavallon road.
Reference
B/2011/0102/F
Status
Granted
Application type
Full
Location
On south side of the Gelvin River from 330m upstream of Upper Gelvin Bridge to 880m downstream to cross under Legavallon road.
Council
Causeway Coast and Glens Borough Council
Received
08-Apr-11
Added
8 Apr 2011

Full proposal: To construct a hydroelectric renewable energy system on the Gelvin river consisting of an intake weir leat buried pipeline and turbine house. Capacity 70kw.

Planning history at this location

1 other application recorded at or next to this site.

  • LA01/2017/0981/F Granted
    Proposed of site replacement dwelling and garage with the existing dwelling retained as it is currently used for historical meetings depicting the life in the…
    425m North West of 167 Legavallon Road Dungiven BT47 4QN · 17 Jul 2017

Recent applications nearby

  • LA01/2025/0275/F Approved
    Proposed Site for Dwelling & Garage on the Farm
    330m N.E. of 167 Legavallon Road Dungiven · 24 Mar 2025